New Facebook Page
Please follow us on our new Facebook page: www.facebook.com/lindrickelectrical
Please follow us on our new Facebook page: www.facebook.com/lindrickelectrical
Time-Lapse video of a recent lighting maintenance project. The maintenance included cleaning of existing light fittings and replacement of faulty lamps and fittings. Mobile Booms were used to enable works at height and to reach light fittings in difficult places.
Installation of new LED Low Bay, High Output lighting to replace existing 400w SON Light Fittings at a local factory.
The installation of LED Light fittings has increased the lighting levels to the area by approximately 150% whilst reducing the energy consumption by approximate 50%.
Project to enhance the lighting levels within a local Community Centre Hall. A new suspended ceiling was installed which included numerous LED recessed lighting panels and emergency lights.
Before and after photos…..
Commercial lighting upgrade/maintenance. Use of MEWP’s were used to work at height in order to carry out routine lighting maintenance and upgrade of faulty light fittings. This routine lighting maintenance/upgrade increased the average lux levels by 25%.
Recent commercial lighting and distribution installation in Rotherham. Installation of new LED lighting system which has increased the current lighting levels in a production area. The installation of new Tray Work and Cable Containment Systems have been installed for new machinery. In addition there was a requirement for a new three phase distribution system.
Recent photos of a re-landscaped garden area which incorporates the good use of sleepers for steps and visual impact. LED lighting has been used to enhance the visual impact and provide adequate lighting for use at night. A new fence has been installed to the boundary and the use of plum slate to replace the soil areas to keep the garden low maintenance.
Recent high level lighting installation and refurbishment at a local wood factory. Replacement light fittings, re-lamping, and cleaning of all high level lighting to increase lighting levels throughout the factory. Use of MEWP’s were required in order to work at heights of up to 8 meters.
It’s that time of the year again where everyone is starting to use their external lights. Routine inspections, Cleaning, Light fitting replacements and Lamp swaps. Timer controls are changed to suit the daylight saving hours Photo-Cells cleaned or swapped to ensure correct functionality of the lights.
Installation of new RGB colour changing LED flood lights to the National Fluid Power Centre in Worksop. A lighting design was carried out to enhance the front of the building which would hopefully attract interest to passers by and enhance the architectural features of the building. The lighting is operated by a mixture of photo-cells and timers to work in conjunction with yearly daylight hours.
CALL US NOW ON 01909 532897
No job is too small and we offer free quotations along with friendly & reliable electrical services and advice. Lindrick Electrical Services are full scope Part P registered with ELECSA and ECA registered which enables us to test and certify all our electric / lighting work as well as to carry out and certify commercial electrical installations.
We also carry the Government Trustmark logo for electrical installations